|
|
|
| The 2nd of two full bathrooms on the upper floor used to be a porch until water lines were installed in 1932. The original porch floor was slanted to let off rain and this was never corrected leading to unbelievable problems. | |
|
|
|
|
|
|
| To see the photo page, click here. | |
| To see the journal for this renovation, click here. | |
| To see the main Renovation Page, click here | |