The 2nd of two full bathrooms on the upper floor used to be a porch until water lines were installed in 1932.  The original porch floor was slanted to let off rain and this was never corrected leading to unbelievable problems.

To see the photo page, click here.
To see the journal for this renovation, click here.
To see the main Renovation Page, click here